Do you handle permits?
We coordinate with your contractor or handle permitting directly if we’re managing the job.
Can you do layout planning for us?
Yes — we help with pipe routing, drain location, and venting design as part of the quote process.
How long does a rough-in take?
A single bathroom rough-in usually takes 1–2 days. Full-home jobs range from 2–5 days depending on access and scope.
What if framing changes mid-job?
We’re flexible. We can adjust runs or reroute based on changes — always staying within code.